Task Board for Team System Beta 3 Released

Last week saw the release of the Beta 3 version of the Task Board for Team System.

 

For those not in the know, the Task Board for Team System is an interactive user interface created for the Scrum for Team System process template.

 

So what's new in beta 3?

Licensing

One of the main focuses of the [Beta 3] release has been the implementation of a licensing structure. Licensing has been implemented in preparation for the commercial release of the Task Board product.

Keyboard Shortcuts

In order to improve productivity, we have added keyboard shortcuts.

  • Open [Ctl]+O
  • Find [Ctl]+F
  • Save All [Ctl]+[Shift]+S
  • Save [Ctl]+S
  • Cancel [Ctl]+T
  • Cancel All [Ctl]+[Shift]+T
  • Filter Work Items [Ctrl]+U

Improved Work Item Filtering

Previous beta releases handled work item filtering by passing a query to the Team Foundation Server application tier. The work item filtering has been moved to the client in this release. In addition, the filtering capabilities have been greatly increased.

It is now possible to filter by:

  • Backlog Item Team (multiple selections)
  • Backlog Item State (multiple selections)
  • Backlog Item Type (multiple selections)
  • Bug Severity (multiple selections)
  • Exclude Empty Backlog Items
  • Task Teams (multiple selections)
  • Task Assigned To (multiple selections)
  • Area Path

The ability to create customised filters has also been added.

Conditions Of Acceptance

The product backlog item "conditions of acceptance" field is now accessible through the task board interface.

In Build

The Bug work item "In Build" field is now available through the task board interface.

Area Path

All work items now have access to their area path via the task board interface.

High Contrast Mode

The task board now includes an option to change the display mode. Two display modes currently exist. Rich display and High Contrast. Rich display shows a multi colour view of the task board swim lanes with icon indication of states. The High Contrast mode displays the task board in black and white with icon water marks. The intention of this mode is to make the task board more compatible with projected displays. This would have helped my company presentation a little, ahem!

Extended Edit Panel Functionality

The edit panel dialogs (for Product Backlog Item, Bug and Sprint Backlog Item) have been updated. The panel can now be resized to allow for more visible text and includes tab controls to better arrange the work item properties. Edit panels now also accept keyboard short cuts; [Ctrl]+S to save, [Ctrl]+T to cancel (terminate).

Allow Multiple Edit Panels

Several beta testers requested that they wanted to be able to copy and paste text between work items. To facilitate this, I have added the ability to open multiple edit panels. Also includes is a cancel all keyboard shortcut: [Ctrl]+[Shift]+T

Application Menus and Concealable Toolbars

Menus have been added to the task board. This offers easier navigation around the applications options and also enables the ability to toggle the display of tool bars. Toolbars can now be hidden to reduce wasted screen real estate.

Display "Assigned To" on the Sprint Backlog Item Object

The assigned to value of the Sprint Backlog Item is now visible on the task object in the swim lane.

Enforce Work Item Title Max Length

The maximum length of a work item title cannot be exceeded in the edit panel.

Backlog Item Story Points

The Estimated Effort field [in Product Backlog Items and Bugs] has now been renamed to Story Points. This is to reduce confusion about the possible relationship and correlation between this and the Estimated Effort field for the Sprint Backlog Items.

Dialog Button Layout Updated

The position of the dialog buttons has been corrected. Now, the positive response to a dialog is on the left.

Auto Select Title Text

When editing a work item, the title text is selected by default.

Auto Update New SBI Work Remaining

When creating a new Sprint Backlog Item, entering a number into the Estimated Effort field will also update the work remaining field.

Statistics Dialog

The task board now includes a statistics dialog. This window shows the total number of loaded work items broken down by work item type and work item state. The number of visible (none filtered) work items are also shown. The sum total of Estimated Effort, Work Remaining and Story Points is included, broken down by visible and total loaded.

List of TFS URLs

The sprint selection panel now includes a dropdown list of the previously selected Team Foundation Server URIs.

Edit Work Items from Search Dialog

Doubling clicking on work items within the search dialog result list now launches the work item edit panel.

Reset Column Layout

A new menu option is included that allows the user to reset the task board state column widths to their default sizes.

Performance Enhancements

The previous Beta release suffered from sluggish / laggy response whilst typing. This has been fixed. The service level processes of the application have been streamlined to improve performance. The task board is now visibly slicker during use.

Bug Fixes

Many Beta 2 version bug fixes have been resolved. Including; a memory leak fix, clearing previously loaded work items on sprint change, and many other minor fixes.

Well that about covers the new features.

 

If you're interested in joining the Task Board for Team System beta testers program (it's free!), see the links at the end of this post.

 

Regards,

Crispin Parker,
Technical Consultant,
Conchango.

 

Links:

Scrum for Team System - Home Page

Task Board for Team System - Home Page

Task Board for Team System - Beta Testers Forum

Published 25 September 2008 21:34 by crispin.parker

Comments

No Comments
Anonymous comments are disabled
Powered by Community Server (Personal Edition), by Telligent Systems